
South Haven 2
Launch price AED 779K*
*Prices, availability, and purchase conditions may change frequently. Contact SKID on WhatsApp for the latest verified unit availability and pricing.
Developer
Key information
- Delivery date
- Sep 2029
- Location
- Dubai, Dubai Industrial City, South Haven 2
- Payment plan
- 15/85/0
- Property types
- Apartment
- Government fee
- 4% + AED 4,200 admin
- Ownership type
- Freehold
- Starting price / sq.ft
- AED 2,269 / sq.ft
- Unit sizes
- From 343 sq.ft
- SKID score
- 6.0 / 10 (Proceed with caution)
Similar projects like this
Payment plan
15%
Down payment
AED 117K
At sales launch
85%
During construction
AED 662K
Construction milestones
0%
On handover
AED 0
Sep 2029
Published milestone schedule · Payment Plan (~3 years post handover)
Project timeline
Project announcement
Samana Developers official release
Booking & registration
Open for unit reservation
Construction phase
Active development
Expected completion
Sep 2029
About the project
Proceed with caution.
Several evidenced factors are weak.
SAMANA South Haven 2 is a residential development by SAMANA Developers located in Dubai South. The project offers studios, one-bedroom apartments in several layout options, and two-bedroom apartments with a storage room. The residences feature functional layouts, thoughtful zoning, and a calm interior colour palette that creates a comfortable atmosphere for everyday living. The building comprises six residential floors, while the rooftop features additional spaces for leisure and sports. The architecture combines clean contemporary lines, panoramic glazing, and spacious balconies with rounded corners. Light-coloured façades are complemented by warm accents and integrated landscaping, while the landscaped grounds create an open and welcoming residential environment. The project’s amenities include a variety of spaces for leisure, sports, and socialising, including swimming pools, an outdoor fitness area, a jacuzzi, sauna and steam room, a jogging track, an outdoor cinema, a co-working space, and children’s areas. Al Maktoum International Airport, Expo City, Ibn Battuta Mall, Dubai Investment Park, Dubai Marina, Legoland Dubai Parks & Resorts, and Jebel Ali are approximately 15–20 minutes away from the development.
The published payment schedule requires 100% of the contract price (~AED 779,268) during construction, with 0% due at or after handover.
Amenities
- Adults’ Pool
- BBQ
- Children’s Pool
- Community Lawn
- Covered Gym
- Coworking Zone
- Jogging Tracks
- Kids’ Play Area
- Kids’ Splash Pad
- Landscaped Open Areas
- Lift
- Lounge
- Multipurpose Sports Courts
- Open-Air Gym
- Outdoor Cinema
- Outdoor Multipurpose Space
- Pool Deck
- Sauna
- Shared Jacuzzi
- Sitting Area
- Steam Room
- Sunken Seating
- Walking Paths
Units
from developerStudio
Floor plan not published by source343 sq.ft · AED 2,269 / sq.ft
From AED 779K
2 BR
Floor plan not published by sourceSize on request
Price on request
Floor plans & layouts
Floor plans not yet published by developer
Request the latest developer brochure and unit floor plan sheets on WhatsApp.
Price comparison & DLD history
8-Factor Evidence Breakdown
7/8 factors backed by verified evidence (82% weight coverage) · skid-geo-v3.0-8factor
Asking price is 68.0% higher than comparable off-plan registrations (+AED 919/sq.ft.)
AED 2,269 / sq.ft.
AED 779,268 starting price · 344 sq.ft.
AED 1,350 / sq.ft.
~AED 463,725 for the same size
+AED 919 / sq.ft. (+68.0%)
+AED 315,543 vs historical median
Show bar comparison & transaction context
Historical transaction context: The asking rate is 68.0% (~AED 315,543 on a 344 sq.ft. unit) above recent comparable off-plan registrations in Dubai Industrial City. Paying above recent nearby transactions increases your upfront entry basis—local secondary prices would need to sit at least 68.0% higher—plus ~4%–6% in registration and resale costs—at handover just to match today's baseline.
Get an available quotation
Select a verified unit bucket to inspect published pricing and payment milestones.
AED 117K
At booking
AED 662K
Construction milestones
AED 0
Handover Sep 2029
View full 8-factor score breakdown & recent DLD sales
SKID intelligence
How does this project compare across all 8 factors?
- Evidence Coverage
- 7/8 factors (81.8%)
- Methodology
- skid-geo-v3.0-8factor
0.3 since last analysis
Last evaluated: 2026-10-30
Strong
- • Handover sits in a typical 1–3 year off-plan window
Watch
- • Located in Dubai Industrial City
- • Active UAE developer with established multi-project delivery history
- • 8 competing launches in Dubai Industrial City
- • Service charge published at 15
Risk
- • 0% of the price is due at or after handover
- • 24 primary off-plan registrations in this community (0 completed or secondary resales recorded yet)
See all 8 scoring factorsWhy SKID gave it 6.0Hide
Why SKID gave it 6.0
Location
Weight: 29.6%
Located in Dubai Industrial City
Entry price
Weight: 18.2%
Published starting price vs historical DLD closed sales median is +68.1% (excluded: > 50% above historical ready stock)
Developer
Weight: 22.2%
Active UAE developer with established multi-project delivery history
Supply / competition
Weight: 14.8%
8 competing launches in Dubai Industrial City
Payment plan
Weight: 14.8%
0% of the price is due at or after handover
Delivery risk
Weight: 7.4%
Handover sits in a typical 1–3 year off-plan window
Exit liquidity
Weight: 7.4%
24 primary off-plan registrations in this community (0 completed or secondary resales recorded yet)
Service charges
Weight: 3.7%
Service charge published at 15
Recent sales nearby
| Date | Type | Price | Sq ft | AED / sq ft |
|---|---|---|---|---|
| 2026-07-03 | Off-plan · Apartment | AED 1.43M | 1,023 | 1,400 |
| 2026-07-03 | Off-plan · Apartment | AED 949K | 729 | 1,302 |
| 2026-07-02 | Off-plan · Apartment | AED 575K | 389 | 1,479 |
| 2026-07-01 | Off-plan · Apartment | AED 1.03M | 851 | 1,215 |
| 2026-07-01 | Off-plan · Apartment | AED 912K | 786 | 1,161 |
| 2026-06-29 | Off-plan · Apartment | AED 579K | 389 | 1,488 |
| 2026-06-25 | Off-plan · Apartment | AED 969K | 843 | 1,150 |
| 2026-06-25 | Off-plan · Apartment | AED 572K | 379 | 1,511 |
| 2026-06-25 | Off-plan · Apartment | AED 598K | 376 | 1,589 |
| 2026-06-25 | Off-plan · Apartment | AED 927K | 729 | 1,271 |
| 2026-06-25 | Off-plan · Apartment | AED 1.03M | 747 | 1,383 |
| 2026-06-25 | Off-plan · Apartment | AED 570K | 389 | 1,466 |
| 2026-06-25 | Off-plan · Apartment | AED 556K | 395 | 1,408 |
| 2026-06-25 | Off-plan · Apartment | AED 465K | 388 | 1,198 |
| 2026-06-25 | Off-plan · Apartment | AED 947K | 843 | 1,123 |
| 2026-06-25 | Off-plan · Apartment | AED 575K | 376 | 1,528 |
| 2026-06-25 | Off-plan · Apartment | AED 592K | 389 | 1,523 |
| 2026-06-25 | Off-plan · Apartment | AED 455K | 365 | 1,247 |
| 2026-06-24 | Off-plan · Apartment | AED 484K | 372 | 1,299 |
| 2026-06-24 | Off-plan · Apartment | AED 540K | 415 | 1,301 |
| 2026-06-24 | Off-plan · Apartment | AED 382K | 415 | 920 |
| 2026-06-24 | Off-plan · Apartment | AED 737K | 557 | 1,324 |
| 2026-06-24 | Off-plan · Apartment | AED 561K | 389 | 1,442 |
| 2026-06-24 | Off-plan · Apartment | AED 467K | 389 | 1,201 |
Closed sales in this community. These are not this tower's own contracts unless the record says so.
Location
Dubai, Dubai Industrial City, South Haven 2
Interactive map ready (1 verified location)
Living in Dubai Industrial City
Historical DLD Median
AED 1,350 / sq.ft
Historical DLD Sample
130 closed sales
Ownership
Freehold
Frequently asked questions
Is South Haven 2 a good off-plan investment in Dubai Industrial City?
South Haven 2 in Dubai Industrial City (Dubai) scores 6.0/10 (caution) on the independent SKID 8-factor off-plan model across 82% evidenced factor weight. Proceed with caution. Several evidenced factors are weak. Strongest evidenced factor: delivery risk. Weakest: payment plan. Historical DLD Closed Transactions: matched closed sales in Dubai Industrial City record a median of AED 1,350/sqft across 130 verified transactions. Reviewed by SKID Investment Research Engine (as of 2026-10-30).
Who is building South Haven 2?
Samana Developers is the developer named on this launch.
When is handover for South Haven 2?
The published handover is Sep 2029.
What is the starting price of South Haven 2?
The published starting price is AED 779K.
What does the SKID screen mean for South Haven 2?
The SKID screen for this launch in Dubai Industrial City is 60 out of 100. It ranks the published payment plan, handover date, starting price, and whether a developer is named. It is not a buy signal. Run the simulation before you reserve.
South Haven 2
From AED 779K · 6.0 / 10



